After a long wait for surveys and quotations, the screed was poured over the underfloor heating pipes on Wednesday. Thanks to Shane and Ace Concrete Solutions for their excellent service.
Monday, 20 November 2017
Wednesday, 15 November 2017
Underfloor Heating
The underfloor heating pipework is all now in place in the new kitchen and snug, pressurized, ready for the screed to be poured.
Monday, 13 November 2017
Inglenook
Another step in refurbishing the inglenook we unearthed in the sitting room. I built a new stone plinth a couple of days ago and the slab bed laid today, now waiting for the joints and wall to be lime pointed.
Sunday, 5 November 2017
Autumn Morning
It was a glorious if chilly morning here at the Cottage, especially at the bottom of the orchard, beside the burn.
Subscribe to:
Posts (Atom)
-
I bit the bullet yesterday and climbed onto the roof to remind myself of the work that needs to be done up there, not a happy visit. Apart ...
-
As we go on our journey through life, we make decisions which are often life changing and occasionally give cause for reflection why? Afte...
-
The Greengage tree has borne a huge quantity of fruit this year, having previously produced no more than half a dozen edible fruits in twent...